Our processes
![icon-etude](https://aqualyse.net/wp-content/uploads/2021/03/icon-etude.png)
1. PRELIMINARY STUDIES
The information provided by the customer is assessed during the initial study and feasibility phase, to check the theoretical feasibility of our treatment.
![icon-methodologie](https://aqualyse.net/wp-content/uploads/2021/03/icon-methodologie.png)
2. FEASIBILTY STUDIES
Phase 1 Lab – Reduced volume tests. Wastewater samples taken from the customer’s site and tested in our lab. Parameter optimization.
Phase 2 On-site –
Pre-industrial volume tests at the customer’s site with our mobile industrial demonstrator.
This phase enables lab test optimization and validation in situ.
![icon-conception](https://aqualyse.net/wp-content/uploads/2021/03/icon-conception.png)
3. INDUSTRIAL EQUIPMENT DESIGN AND PRODUCTION
– Draft contractual specifications and sales contract
– Engineering and Design
– Technical drawings
– Work order
– Supplies
– Machine assembly
– Workshop set up and Quality Control
-On-site delivery and installation
– On-site performance report
– Withdrawal of reservation
![aqualyse aqualyse](https://aqualyse.net/wp-content/uploads/2021/04/3.jpg)
![aqualyse aqualyse](https://aqualyse.net/wp-content/uploads/2021/04/4-scaled.jpg)
![aqualyse aqualyse](https://aqualyse.net/wp-content/uploads/2021/04/2.jpg)
![aqualyse aqualyse](https://aqualyse.net/wp-content/uploads/2021/05/logo-aqualyse-2-en.png)